The UK’s first commercial on shore Wind Farm was built in 1991.

Since then, onshore wind energy has become established as a clean, efficient and productive way of producing energy.

Inside the tower of a wind turbine, many cables are connected for the communication between the different turbines as well as for monitoring and control between base of the tower and the nacelle.

The space within the tower, and particularly within the cabinet is very limited.

Installation and maintenance costs are reduced by efficient and organised structured cabling with clear labelling and numbering of ports.

Aspire Network Solutions have experience of just such environments, providing our expert cabling services using top quality products.